THE BASIC PRINCIPLES OF ATS SOCOMEC

The Basic Principles Of ATS Socomec

The Basic Principles Of ATS Socomec

Blog Article

Additionally, it makes it possible for A neater and trouble-cost-free mounting of your switches on a back plate with preassembled screws

Transfer Change Selector Find the switching Alternative to improve your set up The web configurator that can help you locate the most effective switching equipment on your installations from 16A to 6300A.

They're supposed for use in low voltage ability provide methods where by a short interruption on the load supply is suitable throughout transfer.

ATyS t and g switches supply sizeable time preserving during commissioning (system will take two to three minutes). Owing to the design that permits commissioning via just two potentiometers (four to the ATyS g) and four DIP switches, a scrrewdriver is all that is necessary to configure the parameters.

For included simplicity, they also supply an autoconfiguration purpose which permits automatic adjustment from the rated voltage and frequency.

Watchdog relay to check product or service availability ATyS g goods are equipped having a Watchdog relay which constantly screens your products, thus securing the set up.

Additional sturdy The current style involves metallic mounting legs through the whole ATyS selection, improving upon the general robustness of the switches.

Integrated auxiliary contacts As Element of the solution checking functionality, the ATyS r enable the transmission of knowledge relating to their placement. This can be done thanks to the regular integration of an auxiliary Get hold of for every position.

Protection and dependability ATyS p have the two electrical and mechanical interlocks for more info max safety. The 0 position delivers electrical security disconnection and allows TSE lockout According to IEC60947-3.

5kW – DKPP1-4020AB 4P 20AAC21AC23A 415V: 20A: five.5kW 1NO+1NC DKPP1-4032AB 4P 32AAC21AC23A 415V: 32A: 11kW 1NO+1NC DKPP3-4040AB 4P 40AAC21AC23A…

FR Resource library has every little thing you would like to assist you pick out the very best electricity Alternative.

Far more sturdy The updated design incorporates metal mounting legs over the full ATyS range, bettering the overall robustness from the switches. It also makes it possible for A neater and problems-no cost mounting in the switches over a again plate with preassembled screws.

Be sure to insert the day and time the flight takes off, as informed by the airline. The pick-up time will likely be calculated routinely bearing in mind journey time and Look at-in time at airport.

Journey operate ATyS p M incorporates a operate for returning for the 0 placement in case of the loss of both power supply sources (tripping). This safeguards the load from concerns as a result of source instability.

Report this page